WZSC Glossary
Browse the glossary using this index
Special | A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | ALL
A |
|---|
Automatic Lane | |
Average Annual Daily Traffic (AADT)The total volume of traffic passing a
point or segment of a highway facility in
both directions for one year divided by the number of days in the
year. Normally, periodic daily traffic volumes are
adjusted for hours of the day counted, days of the week, and
seasons of the year to arrive at average annual daily traffic.
MUTCD 2009 Edition with
May 2012 Revisions 1
and 2 | |
Average Daily Traffic (ADT)The average 24 hour volume, being the total volume during a stated
period divided by the number of days in that period. Normally, this
would be periodic daily traffic volumes over
several days, not adjusted for days of the week or seasons of the
year. MUTCD 2009 Edition with
May 2012 Revisions 1
and 2 | |
Average Day | |
Average Speed | |
B |
|---|
BackplateSee Signal Backplate.
MUTCD 2009 Edition with
May 2012 Revisions 1
and 2 | |
BARRICADES | |
Barrier-Separated LaneA preferential lane or
other special purpose lane that is separated from the adjacent
general-purpose lane(s) by a physical barrier. MUTCD 2009 Edition with
May 2012 Revisions 1
and 2 | |
BeaconA highway traffic signal
with one or more signal sections that
operates in a flashing mode.
MUTCD 2009 Edition with
May 2012 Revisions 1
and 2 | |
BEACON (TRUCK-MOUNTED) | |

Social networks