Maximum Highway Traffic Signal Preemption Time

The maximum amount of time needed following initiation of the preemption sequence for the highway traffic signals to complete the timing of the right-of-way transfer time, queue clearance time, and separation time. MUTCD 2009 Edition with May 2012 Revisions 1 and 2

» WZSC Glossary