When used in Part 8, the maximum amount of time needed for the
worst case condition, prior to display of the track clearance green
interval. This
includes any railroad or light rail transit or highway traffic signal
control equipment time to react to a preemption call, and
any traffic control signal
green, pedestrian walk and
clearance, yellow change, and red clearance
intervals for conflicting traffic.
MUTCD2009 Edition with
May 2012 Revisions 1
and 2
Social networks