WZSC Glossary
Browse the glossary using this index
Special | A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | ALL
Q |
|---|
Queue Clearance TimeWhen used in Part 8, the time required for the design vehicle of
maximum length stopped just inside the minimum track clearance
distance to start up and move through and clear the entire
minimum track clearance
distance. If pre-signals are
present, this time shall be long enough
to allow the vehicle to move
through the intersection, or to
clear the tracks if there is sufficient clear storage
distance. If a Four-Quadrant Gate system is
present, this time shall be long enough
to permit the exit gate arm to lower
after the design vehicle is
clear of the minimum track clearance
distance. MUTCD 2009 Edition with
May 2012 Revisions 1
and 2 | |
Quiet ZoneA segment of a rail line, with one or a number of consecutive
public highway-rail grade
crossings at which locomotive horns are
not routinely sounded per 49 CFR Part 222.
MUTCD 2009 Edition with
May 2012 Revisions 1
and 2 | |

Social networks